About the Project
Conducting studies and engineering services for the conceptual design, first, second, and third stages, and on-site supervision of civil and industrial operations for the construction project, dry docks, and support workshops for LNG and VLCC shipbuilding and repair factories.
Including oil tanker berths,
In the mentioned project, approximately 10,700 piles, each approximately 25 meters in length, have been designed and supervised during construction by these consulting engineers.
In this project, a concrete pump house with a height of 24 meters, massive shipbuilding workshops with heights of 60 and 40 meters covering an area of 325,000 square meters, a 4-story office building covering 15,000 square meters, installation of 63,000, 20,000, and 6,000 posts in 8 units, and complete implementation of site electrical support facilities and water and sewage facilities have been executed.
The studies of passive defense regarding the pump station and dry docks have been the criteria for the design.