Development of Chamkhale port for tourism, recreation and water sports
About the Project
Conceptual Design, Basic and Detailed Engineering, Procurement Engineering, Evaluation (Preparation of detailed execution drawings and overall (E)
Providing engineering services including project management (MC) throughout the implementation and warranty period.
Project Execution Operations
Including 352 meters of access bridge pile and deck (69 piles, each 30 meters long) and approximately one kilometer of wave breakers, considering the required mechanical and electrical facilities during the operation period.
Images
Share:
Facebook
Twitter
LinkedIn
Telegram
WhatsApp
Email